BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20231103T133000Z
DTEND:20231103T150000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Common Grounds: A Lot Can Happen Over Coffee (LIVE)
DESCRIPTION:Every great conversation begins with great listening.  If you belong to the Chamber to stay in the know and make an impact\, this is the event for you! Attend November's Common Grounds and hear updates from the City of Greeley on the 12th Street Storm Drain Outfall.\n\n\n\nThe City of Greeley is building a new underground storm drain system to prevent flooding in the downtown area. In the past\, floods have caused problems with traffic and damaged homes and businesses.\n\n \n\nPhase 1 of the project is underway\, close to 10th Street and U.S. 85 near the Poudre River. Phase 1 involves installation of storm infrastructure\, public art\, river restoration\, and an extension of the Poudre Trail.\n\n \n\nPhases 2 - 4 will continue the stormwater management project along 12th Street in downtown Greeley. The improved storm drainage system will reduce flooding in the area by adding drainage capacity including a larger stormwater pipe and new inlets.\n\nDesign for phases 2 - 4 began in January 2023 and construction is scheduled for completion in 2027.  Phases 2 - 4 will extend the 12th Street storm drain system along 12th Street from 2nd Avenue to 8th Avenue. Storm drain systems are built beginning with the "downstream" end\, the outfall at the river\, and move "upstream\," increasing the system's capacity to capture stormwater in phases.\n\n \n\nThe project will also reconfigure the existing roadway section along 12th Street from 2nd Avenue to 8th Avenue and add surface features to improve stormwater quality before it is discharged into the Poudre River.\n\n \n\nBusiness owners along the corridor are highly encouraged to contact the City to aid in the street design outside of their business.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:12px\;"><span style="font-family:arial\;">Every great conversation begins with great listening.&nbsp\; If you belong to the Chamber to stay in the know and make an impact\, this is the event for you! Attend November&#39\;s Common Grounds and hear updates from the City of Greeley on the&nbsp\;</span></span><u><strong>12th Street Storm Drain Outfall</strong></u>.<br />\n<br />\n<span style="font-size:12px\;"><span style="font-family:arial\;">The City of Greeley is building a new underground storm drain system to prevent flooding in the downtown area. In the past\, floods have caused problems with traffic and damaged homes and businesses.<br />\n&nbsp\;<br />\n<strong>Phase 1</strong> of the project is underway\, close to 10th Street and U.S. 85 near the Poudre River. Phase 1 involves installation of storm infrastructure\, public art\, river restoration\, and an extension of the Poudre Trail.<br />\n&nbsp\;<br />\n<strong>Phases 2</strong> - 4 will continue the stormwater management project along 12<sup>th</sup> Street in downtown Greeley. The improved storm drainage system will reduce flooding in the area by adding drainage capacity including a larger stormwater pipe and new inlets.<br />\nDesign for phases 2 - 4 began in January 2023 and construction is scheduled for completion in 2027.&nbsp\; Phases 2 - 4 will extend the 12th Street storm drain system along 12th Street from 2nd Avenue to 8th Avenue. Storm drain systems are built beginning with the &ldquo\;downstream&rdquo\; end\, the outfall at the river\, and move &ldquo\;upstream\,&rdquo\; increasing the system&rsquo\;s capacity to capture stormwater in phases.<br />\n&nbsp\;<br />\nThe project will also reconfigure the existing roadway section along 12th Street from 2nd Avenue to 8th Avenue and add surface features to improve stormwater quality before it is discharged into the Poudre River.<br />\n&nbsp\;<br />\nBusiness owners along the corridor are highly encouraged to contact the City to aid in the street design outside of their business.</span></span>
LOCATION:The Greeley Area Chamber of Commerce 902 7th Ave\, Greeley\, CO 80631
UID:e.790.18246
SEQUENCE:3
DTSTAMP:20260405T141658Z
URL:https://business.greeleychamber.com/events/details/common-grounds-a-lot-can-happen-over-coffee-live-11-03-2023-18246
END:VEVENT

END:VCALENDAR
